How much do the Permits cost?

BUILDING PERMITS: Fees are based upon the total cost of the improvements to be made, with a minimum fee of $42.84. The fee for demolishing a structure is $53.04 and the fee for moving a structure (including a mobile home) is $79.56. ELECTRICAL PERMITS: Fees are based upon the number and type of outlets to be installed and/or the number and size of main or subpanels, with a minimum of $42.84. PLUMBING PERMITS: Fees are based upon the number of fixtures or devices to be installed, with a minimum fee of $42.84. MECHANICAL PERMITS: Fee is based upon the cost of the work to be performed, with a minimum fee of $42.84. *This fee includes a 2.00% State Levy.

Show All Answers

1. When do I need a Permit?
2. How can I get a Permit?
3. What information is needed for a Permit?
4. How much do the Permits cost?
5. What is a Rental Housing Inspection Program?
6. How does the Rental Inspection Program work?